|
||
|
20th May 2010, 13:34 | #1 |
Posted a thing or two
JAguar X-Type 2.0d Sport Join Date: Jan 2010
Location: Bedlington, Northumberland
Posts: 1,902
Thanks: 2
Thanked 15 Times in 8 Posts
|
List of jobs to be done...
I have a few things that need doing Sooner rather than later)
1. Remove paint from door sills (done and it looks nice, still thinking about doing the waist finishers) 2. Fit new springs (lowerinig by 25mm, and because its cheaper than replacing the broken ones with oem ones) 3. New Wishbone 4. New pads and discs all round. 5. Refurb Alloys (if i hit another curb im going to retake my test.) 6. find the loose wire on the speakers (which keeps cutting the passenger side in and out) what have you got planned for you Motor over the next few months?
__________________
This was My MGZT [SIGPIC][/SIGPIC] Going to miss driving it Support Our Troops http://www.helpforheroes.org.uk/
|
|
|