The 75 and ZT Owners Club Forums

The 75 and ZT Owners Club Forums (https://www.the75andztclub.co.uk/forum/index.php)
-   Social Forum (https://www.the75andztclub.co.uk/forum/forumdisplay.php?f=23)
-   -   Well That Took a While (https://www.the75andztclub.co.uk/forum/showthread.php?t=313568)

RobSun 16th June 2021 14:26

Well That Took a While
 
At the end of my road is a cross roads and over the other side there has been an issue with the road for a while now.

Around 2007 a utility company, by now I have forgotten which, dug up a channel from one kerb to the other, did what ever and filled it in. Over the next couple of years the ground sank and by 2009 it had settled leaving a trough about 3' wide and 6" deep. It runs the full width of the road about 4' from the give way line. If you like its a sleeping policeman in reverse and is an absolute pain.

This morning they came to fix it.

coolguy 16th June 2021 17:56

Councils have a duty to inspect (but often need telling) and then the utility company has 8 weeks to rectify. Most repairs need a follow up but there are never enough staff to undertake.

torque2me 17th June 2021 11:45

Quote:

Originally Posted by coolguy (Post 2886861)
Councils have a duty to inspect (but often need telling) and then the utility company has 8 weeks to rectify. Most repairs need a follow up but there are never enough staff to undertake.

But I wonder what the maximum timescale is for them to be liable to fix/repair. Does anyone know?

Kev

coolguy 17th June 2021 12:30

Quote:

Originally Posted by torque2me (Post 2886967)
But I wonder what the maximum timescale is for them to be liable to fix/repair. Does anyone know?

Kev

No end date because they assume that enforcement will be timely!


All times are GMT. The time now is 13:19.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright © 2006-2023, The Rover 75 & MG ZT Owners Club Ltd