View Single Post
Old 17th June 2021, 11:45   #3
torque2me
Posted a thing or two
 
MG ZT

Join Date: Dec 2009
Location: Hatfield
Posts: 1,378
Thanks: 240
Thanked 144 Times in 118 Posts
Default

Quote:
Originally Posted by coolguy View Post
Councils have a duty to inspect (but often need telling) and then the utility company has 8 weeks to rectify. Most repairs need a follow up but there are never enough staff to undertake.
But I wonder what the maximum timescale is for them to be liable to fix/repair. Does anyone know?

Kev
torque2me is offline   Reply With Quote